Developer's renderSouthMED Egypt (developer)
PROJECTS & EXPERIENCE
SouthMED
Ongoing works- Location
- North Coast, Egypt
- TAYAA's role
- Integrated finishing works
- Period
- 2024–2026
TAYAA's role in the project
TAYAA is currently carrying out integrated finishing works within the SouthMED development on Egypt's North Coast, covering the documented scope set out below.
TAYAA's documented scope
Plastering & insulation
- Interior and exterior plastering
- Thermal and water insulation
Finishes
- Marble supply and installation
- Gypsum board and suspended ceilings
- Painting
- Flooring and ceramic
Joinery & metalwork
- Carpentry and metalwork
TAYAA's role in this development is limited to the finishing works listed here. The development as a whole, its design and its other works are not TAYAA's and are not shown as such.
Source: TAYAA Corporate Profile (SouthMED project case study, 2024–2026), reconfirmed by the Founder. It documents the integrated finishing works listed above.
SouthMED in pictures and video
The material below is the developer's and shows the development as a whole. It does not mean TAYAA carried out everything shown: TAYAA's role is limited to the finishing works listed above.
Building the vision, milestone by milestone (construction update)
SouthMED Egypt (developer)
Construction continues at SouthMED (marina area works)